WLCA

View Original

The Milne Road bridge due in Nov 2013

Just spoke with Mr. Walter Schmid, Bracebridge PW Engineer, regarding Milne Road Bridge. Here is the latest information. The bridge itself has been on order and due in November 2013. C.C Tatham in Bracebridge is preparing the tender for the required work scope for replacement of the Bridge Abutments. Mr. Schmid indicated that the cement to be utilized would have a 12-hour curetime therby reducing the bridge closure time.

The replacement of the new bridge could be accomplished in one day. Closure of the bridge will be minimized.

For those concerned about fuel oil and propane Mr. Schmid said that he had contacted all the oil and propane suppliers and all but one I believe he said had smaller trucks to get the required fuel needs to homeowners.